​​Kildare: 045 83 20 40
Limerick: 061 57 45 40

July 2020

Limestone Patio with Connemara Wall in Limerick City
Completed Work

Limestone Patio with Connemara Wall in Limerick City

This Limestone patio has been supplied and carried out by Creative Driveways in Limerick City. We removed the existing rotten decking and extended the layout of the patio. Then we replaced the old base with a new 804 foundation and hardcore membrane. We built a low Connemara Wall around the patio to give the area

Golden Brown Resin Bound Driveway in Limerick City
Completed Work

Golden Brown Resin Bound Driveway in Limerick City

Here are some before, during and after pictures of a resin bound driveway project, completed by Creative Driveways in Limerick City. We started by thoroughly cleaning the existing surface, that was in a decent condition. We filled in any holes and imperfections. Then we dug out a strip following the curve of the wall to

SMA Tarmac Carpark in Eastlink Business Park, Limerick
Completed Work

SMA Tarmac Carpark in Eastlink Business Park, Limerick

This SMA tarmac carpark project has been supplied and carried out by Creative Driveways near Eastlink Business Park in Limerick. First we removed the original broken surface. Then we laid a new hardcore foundation, that we compacted down. We poured fresh SMA tarmac all over the surface and machine rolled it down to be perfectly

https://www.creativedriveways.ie/new-tarmac-driveway-in-raheen-limerick/
Completed Work

New Tarmac Driveway in Raheen, Limerick

This tarmac driveway has been recently completed by Creative Driveways in Raheen, Limerick. First, we removed the existing old driveway and strip of lawn. We laid down a new foundation and compacted it down. Then we topped the surface with fresh tarmac and machine rolled it down to be completely smooth. Visit our website to

New Tar and Chip Driveway in County Limerick
Completed Work

New Tar and Chip Driveway in County Limerick

Here is another driveway installed by the experts at Creative Driveways in Limerick. The original driveway was graded off with new crushed limestone installed on the driveway. Once the levels were set, we machine power rolled the base to ensure a solid foundation. We sprayed hot tar and bitumen over the entire driveway and the